archive-in.com » IN » T » TEDA.IN

Total: 78

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Solar Water Pumps | TEDA
    Design Simulation Tools Off Grid With Battery Design Simulation Type I Off Grid With Battery Design Simulation Type 2 Grid Tie Without Battery Design Simulation User Guide Contact Solar Water Pumps Configuration A solar PV water pumping system commonly known as a solar pump draws power from solar cell modules to operate a motor pump set Solar power pumps use specially developed and energy efficient motor pump sets to achieve higher discharge which off sets the high initial cost A solar PV water pumping system consists of a number of solar PV modules connected in series parallel combination to generate sufficient power to operate a motor pump The solar PV modules are mounted on a metal frame in a manner that the mounting frame can be turned tilted to ensure that the modules keep facing the sun throughout the day The system does not have any storage battery since power generated is used directly then and there The SPV array converts the solar energy into electricity which is used for running the motor pump set The pumping system can draw water from the open well bore well or stream pond or canal Types of Solar Power pumps SPV water pumping system may be of any one of the following types of motor pump sets 1 Surface mounted motor pumpsets 2 Submersible motor pump set 3 Floating motor pump set 4 Any other type of motor pump sets after approval from test centers of MNRE For details of normal discharge rates of water for different types of pumps please refer MNRE website http mnre gov in file manager UserFiles technical specification spwps 2013 14 pdf Advantages SPV water pumping systems can be installed at a site completely eliminating loss of energy in transmission SPV modules need only minimum maintenance and no

    Original URL path: http://teda.in/solar-water-pumps-2/ (2016-05-02)
    Open archived version from archive

  • FAQs | TEDA
    capacity of 5 kW 10 kW and multiples thereof can be applied for common usage as group application limited to 30 of MNRE bench mark cost or 30 of the project cost whichever is less 2 Which solar PV system will be eligible for the Chief Minister s Solar Rooftop Capital Incentive Scheme The Chief Minister s Solar Rooftop Capital Incentive Scheme applies to grid connected solar PV systems This capital subsidy scheme is for the Grid tie system only 3 How much electricity will a Solar PV system produce For every 1 KW installed the typical solar PV system generation in Tamil Nadu is about 1 500 kWh units per annum Actual energy generation depends on the efficiency of solar tilt angle of the solar panel weather grid availability and cleanness of the solar panels 4 How do I select the Vendors Solar PV systems must be installed only by the qualified Solar Installers empanelled by the Tamil Nadu Energy Development Agency through a tendering system under this scheme The list can be accessed at www teda in pdf CIS INSTALLERS pdf 5 What are the advantages of a grid connected solar system A grid connected photovoltaic power system will reduce the power bill due to the import and export of power through net metering provision Illustration someone imports consumes 1 000 kWh from the grid and exports 600 kWh to the grid in a billing cycle The energy bill will be for 400 kWh 1000 kWh 600 kWh accounted by Netmeter Grid connected PV systems do not require batteries Batteries are costly require periodic maintenance and also lead to wastage of 15 20 energy in storage and retrieval Grid connected PV systemsare much easier to operate and maintain Segregation of load is not required 6 How from where will I obtain the Application format The application format may be downloaded from the weblink www teda in CIS for two different categories as follows a Single Applicant of Individual house comes under category Individual www teda in pdf CIS Individual pdf b Combined Group of Flat owners comes under category Group www teda in pdf CIS Group pdf Or the same may be obtained from Office of TEDA Chennai TAMILNADU ENERGY DEVELOPMENT AGENCY 5th Floor E V K Sampath Maaligai No 68 College Road Chennai Pin Code 600006 7 What is the eligible capacity of Solar Rooftop Photovoltaic Grid Tie power plant under the scheme You may opt for any capacity out of 1 2 5 10 kWp but subsidy will be limited to 1kWp per house flat 8 How do I register Two ways of registration are possible It can be done either Online or Offline as follows Steps for Online Registration Fill in the Application format Individual Group from the following web link www teda in CIS No registration fee a Submit through online Take a print of submitted copy sign and submit the same to TEDA Chennai through post or in person immediately Steps for Offline

    Original URL path: http://teda.in/faqs/ (2016-05-02)
    Open archived version from archive

  • News | TEDA
    Simulation Tools Off Grid With Battery Design Simulation Type I Off Grid With Battery Design Simulation Type 2 Grid Tie Without Battery Design Simulation User Guide Contact News Proposals in MNRE prescribed format for availing CFA for Off Grid SPV Power Plant NEW January 11 2016 by admin Proposals in MNRE prescribed format for availing CFA are invited from interested beneficiaries for the installation of Off grid SPV Power Plant with battery for capacity upto 1 kWp MNRE sanction is available for release of subsidy for 1494 kWp of SPV Power Plants of 1 kWp Solar More Proposals in MNRE prescribed format towards installation of Off Grid SPV Power Plant July 17 2015 by admin Proposals in MNRE prescribed format is hereby invited from interested beneficiaries towards installation of Off Grid SPV Power Plant with battery for capacity upto 1KWp MNRE GoI SPV Off Grid Division had sanctioned for the installation of 2000Nos of SPV Power packs of 1KWp capacity each at individual More MNRE Notification for Government Department and Agencies 26 05 2015 May 29 2015 by admin MNRE Notification for Government Department and Agencies More Enlistment Cancellation April 30 2015 by admin TEDA Enlistment of M s YK5 Power Madurai is hereby cancelled with immediate effect for misusing TEDA enlistment by calling themselves as approved vendor of TEDA More Discontinuation of subsidy for Solar Water Heating Systems SWHS November 24 2014 by admin Discontinuation of subsidy for Solar Water Heating Systems SWHS More TANGEDCO Orders on Net Metering dt 17 02 2014 November 24 2014 by admin TANGEDCO Orders on Net Metering dt 17 02 2014 More List of Empaneled Installers Rate contract tender for Grid Tied Solar Rooftop Power plant of 7kWp 10kWp at identified Government Buildings for SPV Systems November 12 2014 by admin List of

    Original URL path: http://teda.in/category/news/ (2016-05-02)
    Open archived version from archive

  • News and Events | TEDA | Page 2
    how TEDA s initiatives are being featured in media Proposals in MNRE prescribed format for availing CFA for Off Grid SPV Power Plant NEW 11 January 2016 Proposals in MNRE prescribed format for availing CFA are invited from interested beneficiaries for the installation of Off grid SPV Power Plant with battery for capacity upto 1 kWp MNRE sanction is available for release of subsidy for 1494 kWp of SPV Power Plants of 1 kWp Solar Pack each at Individual Houses in state of Tamil More MNRE Information Notice 6 August 2015 MNRE Information Notice More Proposals in MNRE prescribed format towards installation of Off Grid SPV Power Plant 17 July 2015 Proposals in MNRE prescribed format is hereby invited from interested beneficiaries towards installation of Off Grid SPV Power Plant with battery for capacity upto 1KWp MNRE GoI SPV Off Grid Division had sanctioned for the installation of 2000Nos of SPV Power packs of 1KWp capacity each at individual households in Tamil vide MNRE 32 26 2013 14 PVSE Part I dated 26 05 2015 More MNRE Notification for Government Department and Agencies 26 05 2015 29 May 2015 MNRE Notification for Government Department and Agencies More Enlistment Cancellation 30 April 2015 TEDA Enlistment of M s YK5 Power Madurai is hereby cancelled with immediate effect for misusing TEDA enlistment by calling themselves as approved vendor of TEDA More Discontinuation of subsidy for Solar Water Heating Systems SWHS 24 November 2014 Discontinuation of subsidy for Solar Water Heating Systems SWHS More TANGEDCO Orders on Net Metering dt 17 02 2014 24 November 2014 TANGEDCO Orders on Net Metering dt 17 02 2014 More List of Empaneled Installers Rate contract tender for Grid Tied Solar Rooftop Power plant of 7kWp 10kWp at identified Government Buildings for SPV Systems 12 November 2014

    Original URL path: http://teda.in/news-and-events/2/ (2016-05-02)
    Open archived version from archive

  • User profile | TEDA
    Proposals Domestic under JNNSM Status of SPV Proposals Non Domestic under JNNSM Status of SWHS Proposals under JNNSM Solar Energy Policy 2012 Wind Energy Wind resource Assessment in TN for Solar wind hybrid systems Bio Energy Apply Domestic solar rooftop Capital Incentive Scheme Individual Application Domestic solar rooftop Capital Incentive Scheme Group Application Subsidy under JNNSM Solar Power Plant Domestic Subsidy under JNNSM Solar Power Plant Non Domestic Vendor Enlistment JNNSM Status of SPV Proposals Domestic JNNSM Status of SPV Proposals Non Domestic JNNSM Status of SWHS Proposals Payments Released Capital Incentive Scheme SPV SWHS Login Programmes CM s Solar Powered Green House Scheme CM s Solar Rooftop Capital Incentive Scheme Wind Solar Hybrid System Small Hydro Micro hydel projects Watermills Awareness Activities Announcements Achievements Solar Energy Solar Photovoltaic Power Plants Solar Air Heating Systems Part II Scheme 2007 08 of State Govt with 10 Solar Steam Cooking systems Bio Energy Wind Energy Tenders SPV Design Simulation Tools Off Grid With Battery Design Simulation Type I Off Grid With Battery Design Simulation Type 2 Grid Tie Without Battery Design Simulation User Guide Contact Home User profile User profile Retrieve username Email Address Install solar on house save upto Rs 14

    Original URL path: http://teda.in/user-profile/?a=getusername (2016-05-02)
    Open archived version from archive

  • User profile | TEDA
    JNNSM Solar Energy Policy 2012 Wind Energy Wind resource Assessment in TN for Solar wind hybrid systems Bio Energy Apply Domestic solar rooftop Capital Incentive Scheme Individual Application Domestic solar rooftop Capital Incentive Scheme Group Application Subsidy under JNNSM Solar Power Plant Domestic Subsidy under JNNSM Solar Power Plant Non Domestic Vendor Enlistment JNNSM Status of SPV Proposals Domestic JNNSM Status of SPV Proposals Non Domestic JNNSM Status of SWHS Proposals Payments Released Capital Incentive Scheme SPV SWHS Login Programmes CM s Solar Powered Green House Scheme CM s Solar Rooftop Capital Incentive Scheme Wind Solar Hybrid System Small Hydro Micro hydel projects Watermills Awareness Activities Announcements Achievements Solar Energy Solar Photovoltaic Power Plants Solar Air Heating Systems Part II Scheme 2007 08 of State Govt with 10 Solar Steam Cooking systems Bio Energy Wind Energy Tenders SPV Design Simulation Tools Off Grid With Battery Design Simulation Type I Off Grid With Battery Design Simulation Type 2 Grid Tie Without Battery Design Simulation User Guide Contact Home User profile User profile Existing Users Log In Username Password Remember Me Forgot password Click here to reset New User Click here to register New User Registration Username Password Name Email Mobile No

    Original URL path: http://teda.in/user-profile/ (2016-05-02)
    Open archived version from archive

  • Application | TEDA
    under JNNSM Solar Energy Policy 2012 Wind Energy Wind resource Assessment in TN for Solar wind hybrid systems Bio Energy Apply Domestic solar rooftop Capital Incentive Scheme Individual Application Domestic solar rooftop Capital Incentive Scheme Group Application Subsidy under JNNSM Solar Power Plant Domestic Subsidy under JNNSM Solar Power Plant Non Domestic Vendor Enlistment JNNSM Status of SPV Proposals Domestic JNNSM Status of SPV Proposals Non Domestic JNNSM Status of SWHS Proposals Payments Released Capital Incentive Scheme SPV SWHS Login Programmes CM s Solar Powered Green House Scheme CM s Solar Rooftop Capital Incentive Scheme Wind Solar Hybrid System Small Hydro Micro hydel projects Watermills Awareness Activities Announcements Achievements Solar Energy Solar Photovoltaic Power Plants Solar Air Heating Systems Part II Scheme 2007 08 of State Govt with 10 Solar Steam Cooking systems Bio Energy Wind Energy Tenders SPV Design Simulation Tools Off Grid With Battery Design Simulation Type I Off Grid With Battery Design Simulation Type 2 Grid Tie Without Battery Design Simulation User Guide Contact Home Application Application Solar Energy Installation of Solar Water Heating Systems Domestic Installation of Solar Water Heating Systems Non Domestic Format for submitting installation of SPV power plants Domestic Format for submitting installation

    Original URL path: http://teda.in/application/ (2016-05-02)
    Open archived version from archive

  • Terms and Conditions – Group | TEDA
    With Battery Design Simulation Type I Off Grid With Battery Design Simulation Type 2 Grid Tie Without Battery Design Simulation User Guide Contact Home Terms and Conditions Group Terms and Conditions Group Please read the Terms and Conditions Carefully before applying for Capital Incentive Terms Conditions Detailed Guidelines to be adhered by the Applicant 1 For individual applicants only 1 KWp plants for residential purpose will be considered for a TamilNadu Government subsidy of Rs 20 000 per kWp 2 The subsidy can be availed only by domestic consumers with a TANGEDCO service connection under tariff LA 1A 3 The subsidy scheme applies only to grid connected rooftop solar PV systems comprising solar PV modules rooftop support structure solar grid inverter cabling and protective devices Grid tie system only will be considered 4 Solar power that is not consumed in the residential building can be exported to the TANGEDCO grid and will be eligible for solar net metering In solar net metering the consumer pays for the net energy imported from the TANGEDCO grid energy imported from the grid minus energy exported to the grid Exported energy will be credited up to a limit of 90 of the imported energy during a 12 months settlement period To avail of solar net metering the consumer needs to apply to TANGEDCO For details the Tamil Nadu Consumer Guide for Solar Net metering may be consulted This consumer guide can be found here Tamil Nadu Consumer Guide for Solar Net metering 5 Change of address The change of address shall not be allowed If an applicant moves to a different address after the registration of an application a new application with the new address details will have to be filed and application seniority of the old application will be cancelled 6 Signed hard copies after on line registrations must be sent to TEDA office in Chennai immediately If the hard copy application is not received the online registration shall be annulled Seniority will be as per online submission date 7 Applicants who do not make on line applications will be given application seniority on the basis of the date of receipt of the hard copy application in TEDA s Chennai office These applications will be assigned seniority after the on line applications received on that day 8 TEDA will provide sanction letters for both online and offline applications These sanction letters will be available on the website of TEDA for downloading by the applicants The applicants can then check status download workorder formats sanction formats etc by giving their Registration number Sanction number will also be sent by sms email 9 List of Installer Installers approved by TEDA with the price after shortlisting through tender process shall be displayed on the TEDA website The applicant shall select one of the Installer from this list 10 The inter connection between the solar grid inverter and the building s electrical distribution board for a maximum cable length of 25 m will be within the scope

    Original URL path: http://teda.in/terms-and-conditions-group/ (2016-05-02)
    Open archived version from archive



  •